So after the last post, we had a near two week total slowdown of progress due to waiting around for the sheetrock, and then waiting around some more while it takes way longer than expected.
In the meantime, we ended up tearing down every single wall of the house which we should have done in the first place, we've got both front and rear doors re-glassed and lockable, we've got the cement board down everywhere we'll be laying tile, we're in the process of going over each window and door sanding and prepping for primer, we've got the exterior sanded and actually began primer today.
Presently on the interior, the sheetrock is finally almost done, and we can move into the more "final" finishing stages.
Probably though we need a minor miracle to happen, because I really have no idea how we're going to be ready to accept our home goods on the 11th of November. Maybe the trim-out will start by thursday or friday, depending how long that takes as well as painting it all will determine when we can finally sand the floors and move in.....stay tuned folks!
Totally gutted, plus notice the 5 tiny windows we added above the cabinets:
stacks of drywall waiting to be hung:
Eating outdoors:

No comments:
Post a Comment